Career

Career

  1. Aug 2025 – Present

    ManagementLogistics & OpsEngineering

    SwatchOn

    COO

    Joined as COO on the strength of the Dasan fulfillment center results, now leading logistics and operations company-wide along with in-house systems development.

    • Led the move to an outsourced 3PL from contract through system rollout. Shaped contract terms, including a same-day-shipping SLA and protection against one-sided price increases. Built per-order fulfillment-center assignment, a dedicated workspace for the 3PL, fee calculation from receiving records and monthly settlement. Sellers are now told where to deliver inbound stock.
    • Sped up the admin operations console: the home screen went from 6 min 20 s to 0.2 s and the receiving dashboard from 1 min 42 s to 0.4 s. Also fixed outages where a single vendor's currency or a blank invoice quantity stopped purchase-order and shipment pages from loading.
    • Upgraded the desktop app used to message sellers. Reminders about unissued tax invoices are now automated from admin reconciliation data, and each vendor gets one reminder at most. Send status syncs live across PCs, duplicate and misrouted messages are blocked, and the app gained auto-update and Google sign-in.
    • Absorbed the in-house logistics team and moved all inbound and outbound volume to the Dasan center
    • Cut logistics labor cost to under a third of its previous level
    • Contributed to seller communications and SwatchOn Mall policy improvements
    • Build the internal operating systems myself, pairing management with hands-on development

    → SwatchOn Logistics Consolidation

  2. Aug 2025 – Present

    ManagementLogistics & OpsEngineering

    StationOn

    CEO

    The contractor operating SwatchOn's Dasan fulfillment center. Built the logistics operating model and the tools that run it.

    • Redesigned fabric pricing on Coupang around contribution margin instead of markup. Raised prices where ad spend had been exceeding contribution margin and replaced an unsupported logistics-cost assumption with measured figures, which corrected a 72% overstatement. Introduced per-campaign contribution-margin reporting for advertising.
    • Fixed the Coupang listing integration. 115 in-stock items that had been stuck in an unsellable draft state now move automatically through to review, legacy-format SKUs went from 211 to 0, and product names were restored on 2,318 order lines so they appear in sales reports. Also stopped storefront links from disappearing every day.
    • Rebuilt the warehouse outbound workflow. Workers now pack, box and confirm shipments by barcode scanning alone. Courier pickups are booked automatically, waybills and box documents print in batches, and job sheets and labels are designed for thermal printers. Also fixed a bug that made every second shipment request of the day fail.
    • Upgraded the automatic fabric cutter firmware. Cutters now register themselves and can be pointed to a new server remotely, so no site visit is needed. Added length compensation for stretch fabrics, which fixed short cuts where a 1,066mm order came out at just 81cm.
    • Built Doraom, an AI-assisted planner and to-do service. A single web codebase serves the web app, macOS and Windows desktop apps, and iOS and Android apps. Delivered an AI assistant, two-way Google Calendar sync, team sharing, chat, travel and payment schedules, and subscription billing, then submitted the apps to both stores for public review.
    • Expanded a Catholic faith-life app with prayer reminders, offline and group prayer, sacrament records, faith keepsake cards, and links to family and godparents. Published saint biographies for 248 saints through an AI writing and review pipeline, and cut the liturgical data review queue from 267 to 48 items.
    • Moved the pet super-app's infrastructure to a single server in Seoul. Migrated 204 tables and 233,075 rows with no data loss and shut down the old cloud services. Connected subscription conversions from every payment path to the ad platforms, and made ad performance visible in the admin console.
    • Founded the company as the contracted operator of the Dasan fulfillment center
    • Proved higher operational efficiency than the in-house logistics team through systematic process design
    • Built the logistics tooling, including the ERP, in-house

    → AllPawHub — Location-first Pet Super App→ Moabomb→ Worhythm 워리듬→ Doraom→ KAPELLA→ Ranmeet 랜밋→ StationOn ERP — Fulfillment, HR, and Sales in One System→ Wedding Studio Website & Admin CMS

  3. May 2020 – Jul 2025

    ManagementPMGlobal Sales

    Saintics

    Founder & CEO

    Ran a merchandise OEM agency and an own-brand e-commerce business single-handedly for five years.

    • Developed and produced pop-up store merchandise for Simmons Korea
    • Developed and produced Hyungspresso merchandise for the Phantom Singer franchise
    • Handled the entire chain solo — sourcing OEM manufacturers, development, QC, and import clearance
    • Planned, marketed, and sold own-brand products through my own e-commerce channels

    → Simmons Pop-up Store Goods OEM

  4. Jan 2020 – Apr 2020

    ManagementPM

    DSPONE — Corporate Planning

    Assistant Manager

    Reporting to the CEO, overhauled the company's management systems and business processes.

    • Redesigned groupware, ERP, and business processes company-wide, and wrote the operating manuals
    • Defined and ran KPIs for each business unit
    • Rebuilt asset management for company patents and equipment
  5. Jun 2017 – Dec 2019

    PMGlobal Sales

    DSPONE — Business Development

    Assistant Manager

    Led IoT products as PM while opening new overseas accounts, closing the company's first international IoT supply contract.

    • Closed three new supply contracts worth ₩2.2B annually in total
    • Landed the company's first overseas supply contract for an IoT device
    • Sole PM (100% ownership) for the Gotet/XERIDAR smartbands and the E-MOTO motorcycle tracker
    • Signed 4 NDAs and 1 MOA; 8 business trips across 5 countries; 7 trade shows and conferences
    • Established the company's English contract templates — NDA, supply agreement, invoice

    → Gotet Smartband — KRW 2B/yr Solo IoT PM→ E-MOTO Motorcycle GPS Tracker→ Osan City Elderly-Care Smartband

  6. Jan 2016 – Dec 2016

    Global Sales

    Shinhan Technology — Technical Sales

    Sales Engineer

    Started my career in technical sales for environmental measurement instruments and ranked first in the department in my first year.

    • Generated ₩500M in revenue from my accounts — 50% of company revenue
    • Ranked first in the department and second company-wide in sales performance
    • Managed 7 overseas manufacturers, the most in the department
    • Managed 36 accounts including Samsung Heavy Industries, Samsung Electronics, and POSCO
    • Won new accounts through outbound sales